Wednesday, June 27, 2012

Test fit

With the shelf having had a few days to rest and the rendering of the arch being started, it was time to do something very scary, put the oven in the space and check that it fits.

DSCF4146

See it fits….

DSCF4149 The oven in is place for the first time.

Monday, June 25, 2012

Jammed

While walking through the farmers market  in Puntallana, we spotted some lovely Strawberries at a reasonable price, so we brought some and made them into jam. Unfortunately didn't get a perfect set on the jam. But good enough

DSCF4145

Thursday, June 21, 2012

Revealed

After giving it a day to set, we pulled the wood off the oven unit. Now it will need a few weeks to set hard.

DSCF4142

Wednesday, June 20, 2012

Bomb Da Base

Sorry the title is a reference not to the 90’s soundtrack to a video game, but to a mission name in one of my favourite series of video games “Grand Theft Auto”.

DSCF4136

In actual fact what I am referring to is casting the concrete base for the oven, we built the outer structure a while ago with the basic shelves and it’s good to finish them off.  First a web of steel reinforcing bars was added to ensure that it will take the weight of an oven full of a Christmas Turkey.

DSCF4137

The bottom shelf doesn't need extensive reinforcing as nothing is going to sit on top of it anyway.

DSCF4138

With both sections ready, and wood placed at the back of the oven shelf to ensure the ventilation gap remains open at the back, all that is left to do is pour the concrete.

DSCF4139 Then just a quick coat of paint on the ceiling and things start to take shape.

Sunday, June 17, 2012

Holed and Plastered

Over the last few weeks the edges of the plasterboard have been filled and rubbed down repeatedly, now we are left with I lovely smooth surface and when it is painted hopefully you won’t be able to see the joints between the boards.

DSCF4134

And then just as we have go it looking nice, we go and drill some dirty great holes in it!! Don’t worry these will take the light fittings. We have a central light fitting which will take a normal light, then on each side of the room, there are 2 sets of three recessed down lights which will take LED bulbs to give additional light to the sink and the worktop.

DSCF4135

Monday, June 04, 2012

Beans

DSCF4133

If the above is anything to go by this years crop of runner beans could be a good one, despite the fact that the weather has been very dry this year.

Wednesday, May 30, 2012

Boarded Up

With the rest of the roof assembled the last step was to mount the plasterboard, this is where we came slightly unstuck. Having brought the plasterboard and cutting it down to meter widths, so it would fit into the car meant that we had a few more joins in the ceiling than we would have liked.

DSCF4129

But with a little help from our friends, as Helens shoulder is still not at it’s best. All the panels were cut and fitted..

Wednesday, May 16, 2012

Polystyrene

No this isn’t a post dedicated to the Punk Rock singer of the band X-Ray Spex. Sadly this is just about insulation. We cut large sheets of expanded polystyrene to size so that they would fit between the beams of the roof and just pushed them  into  place. The idea being that in the summer the heat will stay above the ceiling (the concrete roof gets very hot) and in winter the heat will stay below in the kitchen (as the concrete roof gets very cold).

DSCF4126

Tuesday, May 15, 2012

Black Plastic

Before we can put the rest of the false ceiling in place we needed to put some plastic sheeting in place, to keep any dampness above and stop it from getting into the ceiling.

DSCF4124

Now trying to get a plastic sheet 2 Meters wide by just over 3 Meters long into place is not an easy thing to do. DSCF4123

Then came the sticky situation of fixing it in place, we eventually discovered that if we applied silicone sealant to the beams and then using a piece of wood and poking my self through one of the gaps that had been left to put in the lights I could smooth the plastic down over the beams.

DSCF4125

Monday, May 14, 2012

Up Periscope

DSCF4121

No we are not building a replica of a submarine with a snorkel and periscope.. This is the ventilation for the kitchen hob and roof.. it is designed to go up inside the old chimney that used to be in the kitchen. one tube will come lower and go through the new false ceiling and be connected to the extractor fan that is to be mounted over the cooker. The other tube (the smaller one) will sit above the ceiling and ventilate the space above the ceiling

DSCF4122

With the wood mounted over the chimney opening and the pipes secured in place with some duct tape the rest of the base of the chimney was filled with expanding foam to secure  it all in place and seal the chimney off, with just the two pipes going through.

Sunday, May 13, 2012

Strange Weather

Sometimes living on a small island in the Atlantic can lead to some interesting weather. None more so than when we have the hot dry weather, this can trap the cooler damp air underneath, and therefore also traps the cloud.  So what you end up with is sometimes the  top of the cloud comes right up almost to the house and you look out over a sea of cloud…Now this is very common at the top of the mountain but very very occasionally we get it at our level. 

DSCF4116

View out over the north coast showing the cloud tops

DSCF4120

As the cloud come closer it get pushed up the ravines…

Saturday, May 12, 2012

Substitution

Now normally it’s Helen that does most of the building work, but at some point over the last few days Helen has pulled a tendon in her shoulder. So up to the plate steps the super sub…..Theresa

DSCF4098

It was left down to Theresa to cut and fit the remainder of the cross beams for the false ceiling.

DSCF4102

It didn’t help that today was one of the hottest days of the year so far.

DSCF4104

But with some sweat and perseverance

DSCF4107

Soon the job was done.

DSCF4109

DSCF4110

Thursday, May 10, 2012

Venting it

Before we can finish the false ceiling, we need to ensure that above the ceiling is ventilated.

This involves drilling some holes in either side of the wall above the level of the roof and fitting a grill on the outside to stop bugs getting in.

DSCF4093

DSCF4094

The holes on the inside.

DSCF4095

DSCF4096

And then the holes on the outside covered by the grills.

Friday, May 04, 2012

One Ring….

The outer ring of the beams that support the false ceiling are screwed to the wall using massive coach bolts, Once this is complete the cross beams are then individually cut to size and fitted in place, and screwed in place from the bottom.

DSCF4091

The ring is complete

DSCF4092

The first of the shorter cross beams in place.

Thursday, May 03, 2012

More beams

Fitting the beam around the cooker unit was a little complicated, a number of pieces needed to be cut and fitted exactly right.

DSCF4090

Wednesday, May 02, 2012

Start of a ceiling

Today we started to put up the beams and woodwork ready for the false ceiling, which is going up in the kitchen. We are putting in a false ceiling for a number or reasons.

1) To insulate the kitchen from the concrete roof, the solid concrete absorbs a lot of heat from the sun which is then radiated out into the room. adding the false ceiling and insulation will stop the room form heating up in the summer and loosing  heat in winter.

2) Appearance, the existing roof is quite rough on the inside and to make it good would have required a lot of plastering, Plus there is also the beam along then end of the room which supports the chimney, the false roof will hide all this.

3) Electrics, it is so much easier to run the conduit on the roof, that have to chisel it in. Also using a false ceiling gives us the ability to use recessed LED lighting.

To start with we put the two beams on each side of the room, this wasn’t easy due to the bad state of the walls, if you are lucky you can drill into something solid, if not we tried to use a compound to glue the raw plug in place, which was a bit of problem, but we figured out a reasonable system and finial got the beams in place.

DSCF4088

DSCF4089

Tuesday, May 01, 2012

Edging the door

One of the downsides of Canarian doors is that they tend to have a gap down the side, which if you are not careful lead to a howling wind whistling round the door.

To counter this we are putting a wooden strip behind the door…

DSCF4111

The strip fitted in place

DSCF4112

Close up showing the join.

DSCF4115

Strip fitted with the door back in place, now just a little foam strip on the edge of the door will seal it and stop draughts coming in.

Monday, April 30, 2012

Making it good

With all the electrics conduit in place now we can start the process of making the walls clean and straight ready for tiling. First just a rough coat of cement render to fill in the lower section of the wall that wasn’t plastered before due to the old kitchen that was here before.

DSCF4087

Saturday, April 28, 2012

Patching Version 2

Once the hole in the floor was filled in al that was then left was to fill in the rest of the holes in the walls

DSCF4084

And just a little bit around the distribution box to finish off

DSCF4085

Thursday, April 26, 2012

And fill one in

With the conduit run in the next step is to fill it back in again, straight forward and simple

DSCF4078

All the conduits held in place nice and securely with the wood.

DSCF4080

Pour in the cement until its full.

DSCF4082