As always when one thing is done another three pop up ....
The first set of windows is done and they look good .. here are the before and after photos..
Although the second window is not painted yet, still waiting for the putty to set, at least you can not hinge the panes out.
The channeling out of the floor for power conduits was going well, and I suppose is still going well but after talking to another English couple who have renovated a local finca, we think it will be better to remove the whole floor so that we can lay a damp proof membrane to stop the damp coming up through the floor. OK I here you say, just add it on top of the sub floor that is there now. The problem with that is that the floor level would then be too height for the doors and door sill. So it looks like more of the floor has to go.... The work so far is shown here.
The filtering on the gray water recycle test blocked up again - so that has been temporarily removed and for now greasy and very dirty water will not go into the system. For now that will have to do..
Next on the list are the grape vines, 3 terraces of vines, at first seemed like a good idea but we did not quire realise the amount of work it would be. I have managed to handle on terrace so far. Striping off the extra leaves and shoots so that the grapes are exposed to the sun, I am not totally sure what I am doing - just following instructions for the Guy we brought the place from. And then you have to dust them with sulphur to help stop mold. We have this thing that sits on my back with a bellows attached to go around like one of the Ghost busters to dust the stuff... Got one terrace done yesterday and it rained today so I will have to do it again tomorrow...