- First we got the new floor down in the entertainment room, around 24 loads of concrete and one cement mixer. We thought that it would take most if not all the sand and gravel we had and 4 or 5 hours work. In the end we only used half to two thirds of the sand and finished in 3 hours. The only problem was that the cement mixer stopped working just before we started the last load .. so had to mix this by hand. Getting the concrete level was fun, used a laser , a peace of wood and a garden rake.. The laser is aligned with marks on the walls and a mark on the peace of wood that corresponds to the correct height of the concrete. The Rake is used to move the concrete around and get it level.
- Second the previous owner arrived and cleared out the second under croft so we now have a second storage/work room to use.
Sunday, July 15, 2007
Floored
Two major events this week and they both happened yesterday.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment