Last week the first rain of winter arrived here in La Palma, not to heavy, only about an inch a day or so but it does mean that the place has started to sprout, ( this should have happened about a month ago but at least it is here now). The funny thing is that it is December and the place is starting to look very green like spring. The seasons are slightly messed up here..... The other thing is that it is Cold (OK only around 17 Deg C), time to get the jumpers out...
On the House front things are moving along, the walls are mostly done in the front room and so is most of the wood stripped, now it is time for the ceiling .... We hope to have the room done for Christmas.
The garden is going OK, We have Collies, Cabbage, Potatoes, carrots etc all growing well. Repairs to the retaining walls of the terraces are OK.. but on hold until we have a few dry days to poor some concrete.
I have also been working to get the second solar power panel up, This requires the construction of two junction boxes with copper bus bars and cables to connect these to the panels, should have these all done by the end of the week.
Thinking back on what we have done on the house and have still to do I have realised that it may almost have been quicker to start from scratch and build a new house . When we finished we will have replaced or put in all the services for the place and that is something I have never done before - not from scratch (OK I did rewire a house in the UK completely for a friend once)...
I do wonder if we will get this place done.... or when we do how long it will take ... But we do do a good job...
Monday, December 03, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment