Now that we have the cement mixer set up in an easier position. We have been able to get a lot of jobs done around the house, the two main ones are the position for the water tanks behind the old toilet block which also includes the pipe work for the connection of the new bathroom toilet into the existing sewerage system. This has meant digging out an area and building a block wall to hold back the earth from the top level outside the house.
Also we have been working on putting the roof on the roof. What I mean by that is that on the roof we have a small block built cupboard which will house all the equipment for the solar panels. This week we added the top to this, and once the cement has set we will top this off with some traditional Spanish tiles.