Work moves forward... On the outside the gray water tank is now in its correct place and yes it has pipes to the house and to the fields (but not the final irrigation connections). We have a wast water connection to the tank now in the dinning room for the temporary kitchen sink, also the main drain connection to the pozo negro has moved closer to the house.
the old location of the gray water tank is now being converted to a small location for potting seeds etc, and concrete paths are being added from the house to the outside loo etc. we hope to have a small formal herb garden created in front of the dining room with a patio, once all the drains are in.
On the Inside work on the dinning room moves slowly forward, most of the wood work has been striped and the first coat of vanish should be on the front doors today (once I have done this blog and got dressed) I would like to get all the wood work done this week so that the painting can be done over the weekend. As the room will be used as a kitchen for a while we are only going to use white paint for now but that should seal the walls. It will have to be redone once the final kitchen is done. To finish all the wood work I need to make some trimming around the door into our bedroom and will try to use some of the old planking that was on the water tank roof.
As to the rest of the house, money is running low so things may take a bit longer than planed, we plan to do only a few things over the summer as we have to work on the web site etc and anything else that may get money in.
We are fighting the worries that all this is going to come tumbling down due to no money coming in, The teaching job that Theresa has ends for the summer this week, we hope that it will start again in September (we are as sure as anything in the future that it will) but we need a bit more coming in to be able to continue the work on the house and to be able to see the family etc.
Tuesday, June 17, 2008