Just a couple of bits to tidy off and the kitchen is rendered.
The window wall.. lower half wasn’t too bad and will be under the cabinets so we left it as is…
Join in our quest for a house of the stars. Through this web site we will keep you up to date with our search and eventual restoration of our dream property on the tranquil island of La Palma.
Just a couple of bits to tidy off and the kitchen is rendered.
The window wall.. lower half wasn’t too bad and will be under the cabinets so we left it as is…
With the shelves complete and drying, the side and the fronts of the unit need to be rendered.
First the side gets a bit of wood screwed to the edge to guide the depth of the render, which then is applied
With Yesterdays work on the wooden former, today's job is to fill it with concrete.
Fill the first section with concrete...Add the next bit of wood…
And Repeat the process……
Then find a half built garden wall to use up the rest of the cement that you have left….
The oven unit that we were working on before needs a small section of concrete putting in to fill the gap between the shelf and the top of the oven. We couldn’t do this before because until the shelf for the oven was constructed we couldn’t tell exactly where the oven would sit. It’s a little tricky as it’s only a small section, that sits at the front the unit.
First two supports are screwed to the side walls.
Then a board is slid in place.
A board is mounted to make the back of the concrete.
A couple of small bits are added to reinforce the whole lot and fix it to the rest of the unit.
Then the boards at the front are fitted more will be added as we pour in the concrete.
This year we decided to put a net over the pear tree to stop the insects and other things getting at them. Only we didn’t quite get to them in time and a lot had gone over ripe before we got to them, but we did have enough to bottle to provide puddings over the next year.
Slowly, bit by bit we are winning the battle, and the kitchen is starting to take shape.
Still a lot to do…
Time is moving on, work has been difficult over the last few weeks just due to the temperatures, being somewhere in the 30’s. But with a spell of cooler weather it’s time to get on.
We now have to tackle the job of getting a smooth flat surface on the kitchen walls ready to take tiles
The last few weeks have been extremely hot and for some of that time we were oven in Tenerife having a short break way from things. Just before we went there was a Major forest fire over there and now not only do we have one on La Palma, there is also a very bad one on La Gomera.
When the wind was in the right direction some of the smoke blew overhead.
Sorry the title is a reference not to the 90’s soundtrack to a video game, but to a mission name in one of my favourite series of video games “Grand Theft Auto”.
In actual fact what I am referring to is casting the concrete base for the oven, we built the outer structure a while ago with the basic shelves and it’s good to finish them off. First a web of steel reinforcing bars was added to ensure that it will take the weight of an oven full of a Christmas Turkey.
The bottom shelf doesn't need extensive reinforcing as nothing is going to sit on top of it anyway.
With both sections ready, and wood placed at the back of the oven shelf to ensure the ventilation gap remains open at the back, all that is left to do is pour the concrete.
Then just a quick coat of paint on the ceiling and things start to take shape.
Over the last few weeks the edges of the plasterboard have been filled and rubbed down repeatedly, now we are left with I lovely smooth surface and when it is painted hopefully you won’t be able to see the joints between the boards.
And then just as we have go it looking nice, we go and drill some dirty great holes in it!! Don’t worry these will take the light fittings. We have a central light fitting which will take a normal light, then on each side of the room, there are 2 sets of three recessed down lights which will take LED bulbs to give additional light to the sink and the worktop.
With the rest of the roof assembled the last step was to mount the plasterboard, this is where we came slightly unstuck. Having brought the plasterboard and cutting it down to meter widths, so it would fit into the car meant that we had a few more joins in the ceiling than we would have liked.
But with a little help from our friends, as Helens shoulder is still not at it’s best. All the panels were cut and fitted..
No this isn’t a post dedicated to the Punk Rock singer of the band X-Ray Spex. Sadly this is just about insulation. We cut large sheets of expanded polystyrene to size so that they would fit between the beams of the roof and just pushed them into place. The idea being that in the summer the heat will stay above the ceiling (the concrete roof gets very hot) and in winter the heat will stay below in the kitchen (as the concrete roof gets very cold).
Before we can put the rest of the false ceiling in place we needed to put some plastic sheeting in place, to keep any dampness above and stop it from getting into the ceiling.
Now trying to get a plastic sheet 2 Meters wide by just over 3 Meters long into place is not an easy thing to do.
Then came the sticky situation of fixing it in place, we eventually discovered that if we applied silicone sealant to the beams and then using a piece of wood and poking my self through one of the gaps that had been left to put in the lights I could smooth the plastic down over the beams.
No we are not building a replica of a submarine with a snorkel and periscope.. This is the ventilation for the kitchen hob and roof.. it is designed to go up inside the old chimney that used to be in the kitchen. one tube will come lower and go through the new false ceiling and be connected to the extractor fan that is to be mounted over the cooker. The other tube (the smaller one) will sit above the ceiling and ventilate the space above the ceiling
With the wood mounted over the chimney opening and the pipes secured in place with some duct tape the rest of the base of the chimney was filled with expanding foam to secure it all in place and seal the chimney off, with just the two pipes going through.
Sometimes living on a small island in the Atlantic can lead to some interesting weather. None more so than when we have the hot dry weather, this can trap the cooler damp air underneath, and therefore also traps the cloud. So what you end up with is sometimes the top of the cloud comes right up almost to the house and you look out over a sea of cloud…Now this is very common at the top of the mountain but very very occasionally we get it at our level.
View out over the north coast showing the cloud tops
As the cloud come closer it get pushed up the ravines…