Wednesday, April 04, 2012

Little boxes

With the walls clean and stable, it’s time to start filling in the holes.

DSCF4057

First thing to go in are the power distribution boxes that will take all the power connections from the sockets.

DSCF4058

Then the sockets for the fridge and work surface.

DSCF4059

And the light switch by the window.

1 comment:

Judith said...

When we go up to our vines in Tijarafe, we drive past a lttle signpost which shows the way to Casa de Estrellas. Is this your home? It is a long way up, and it is even further to our vines which which are near La Cruz de Llano. Your project sounds backbreaking, and you are both very brave! Wishing you well! Judith.