More Power!!!

Today more of the conduit went into the kitchen to take the power for the wall sockets, under cupboard lights and ventilator fan.

DSCF4065

With the infilling complete, we could then finish the concreting of the lower patio. This was a marathon session finishing off, both the sections along the edge, and the section at the bottom of the steps.

DSCF4066

DSCF4068

This completes the major section of the lower patio, enabling access to the front of the house without breaking ankles on the rough surface. Once we can get the new steps built, access to these lower rooms will be much easier.