Following on from all the work of chipping out the spaces for all the power boxes now comes the task of putting everything back in.

DSCF4060

First the power feeds for the fridge and the worktops

DSCF4061

Then just a little cement in the back of the holes on the end wall, the holes ended up a little to deep due to the rocks and other rubbish that is used to make the holes.

DSCF4062

And the light switch by the back door just needed a little plaster.

Back down on the lower patio, with a little help from Sheila and family we have got the ramp level filled and ready to take the final segment of the patio area.

DSCF4063

DSCF4064