With the doorway bricked up its time to render to hole to make it all neat. I am not that good at rendering, I never seem to get it level or smooth but this time it seems to have gone well.
I used two coats, the first the standard sand and cement mortar (I would like to point out at this time, that the standard building sand on the canaries is black and made from crushed volcanic rock. So it is not very fine). The top coat was Morsec (premixed dry morter, tha comes in 25 kg bags. it comes in two types, that I know of, normal and white top coat. I like using the white one). This works very well in thin coats. The result on the door opening is shown below.
Now the wall can be painted.
I think the final result was quit good.
With the last of the Morsec, I finished off the roofs of the solar power huts. That is all the structural work done on the huts now finally the walls can be painted.