Now we have finished a few tasks which needed the cement mixer at the top of the garden we could shift it and the gravel down to the bottom and continue with the lower patio. With the machine down at the lower level it meant that we could just turn the machine over an pour out the cement into the prepared area.
So that's about a 6th of the main area of the lower patio.