Tuesday, February 20, 2007

It's Fiesta Time

No we have not signed for the house but its carnival so everything is shut.
If all goes well we should be signing the end of this week .. If all the parties can get together. In the mean time I have been putting the floor plan of the house into Autocad and doing some rough designs for the kitchen and bathroom.
Current Layout of the House

The dimensions were taken from a photo of a drawing the seller did. I am not quite sure that they are completely correct.
Bed Room 1 is mostly done - just a coat of paint on the walls and ceiling and the windows. The wooden floor needs sanding and vanishing but compared to the rest of the house it is virtually done.
The Dinning Hall (named as it is both a hall between all the rooms and the dinning room) needs quite bit done to it including rendering the walls and possibly the ceiling and quite a few other bits.

The second Bed Room (Temporary office) and living room need a few things done but I can not remember much of there state at the moment.

As to the kitchen and new Bathroom, the current plan is to covert the water tank into the bathroom and remodel the kitchen as shown below:

No comments: