Thursday, July 10, 2008

Inside Plumbing

Finlay Hot water in the house - pity there is no tap yet...
The first stage of the pluming for the temp kitchen is done and so is all the painting and the varnishing of the doors (still have to put the bedroom door on its hinges).
OK the pluming is not much only a few meters of pipe (cast iron, old but it works) And we can plumb the washing machine in.. no more moving it around and connecting it to a long pipe that dumps water in the garden..I will just be glad when we can get rid of the lopsided hot water tank - but that will not be for a while.
The only thing left to do now is put the tiles down and then the dinning room is ready to become a temporary kitchen. How long it will be before the real kitchen is ready will depend on when we get some more money in as our building reserves are now just about run out, but we will have what we need to get on with things and see if we can make a living out here. That is going to be the real test is it not... Mind you we still will move slowly on some things, like knocking the old kitchen about, removing the concrete kitchen units and fire place (shame about that but its is just too big and low).
As to how we are feeling, well things are OK but we are a bit touchy at the moment, I have so many things I want to do and as usual Just cannot seem to get any of them done. As I have never lived in another country for more than two years I am a little worried that it will be the same this time. We will just have to wait and see.

No comments: