Well as the end of the year draws near it's time to review what progress has been made over the last year, and also what has gone wrong.

In January we finally finished decorating the front room which we are calling the library, and the permission came through from the town hall to enable us to put a roof on the old water tank which we are going to turn into a bathroom. Then in February we got the builders in and in 3 days they had the roof on and finished. Meanwhile we got started on the dining room inside which up to this point has just been bear concrete walls. On the outside the mild weather meant that we could finish the steps and ramp down the side of the house. March saw a trip back to the UK to see Helen's grandson Theo. This trip was not as relaxing as I would have liked due to flight delays and missing bags. Also in March we had a scare as Helen fell from one terrace to another requiring a trip to the hospital for an x-ray on suspected broken ribs. Luckily she was OK just badly bruised. April saw work on the area for the water tanks as part of the preparation for the permanent drainage systems.

In May the doorway was converted into a window and the plastering of the walls and ceiling in the dinning room continued. Then in June the first part of the drains went in and the dinning room got painted and woodwork varnished. Then in July the miracle happened we finally got indoor plumbing and the tiles went down in the dining room. Which soon lead in August after a trip to Tenerife to the temporary kitchen going in and finally after 18 months I had a gas cooker with more than 2 rings and sink where the water went somewhere when you pulled the plug out this now means that work can start on the old kitchen which needs the old work tops demolishing and the drainage putting in and also the drainage for the bathroom needs to run through there. Since then it has been crazy I have gone from last year of only having 1 hour of teaching outside of school to having to turn people away as I don't have any more time to give classes. It has not been helped by having a bad head cold which refuses to go away, November and December have also been very cold and damp which has not made things easier. But at the moment the sun is shining.

Recently we have been demolishing the old kitchen. which included a large concrete chimney over what was the old fireplace. Hitting this with a large hammer enabled Helen to get rid of some of her frustrations. All that is left is a very thick concrete beam which goes form wall to wall and will have to be gut out with the angle grinder.

The only bad thing of real note is the continued problems with the car. We have had to have the clutch cable replaced, the ventilation fan is on the blink and I have just been given a price of nearly 400€ to replace it. Without the fan you get a smell of petrol into the car so it has to be replaced soon. The car still has wear on the front tires due to the corners here. And to top it all she still has the intermittent problem where she over revs at idle and despite us cleaning everything it is still happening so I will have to take the car into the workshop early next year and see if they can sort it out.