Saturday, July 04, 2009

And now water in the kitchin!

The final plumbing job under the kitchen floor is to lay the water pipes, cold feed from outside and a hot feed, wow hot and cold water in the kitchen.......!!!!

The original cold pipe arrives in the kitchen where the old sink was... half way up the wall and just ends in a tap. So we needed to remove the old tap and then connect the new piping, run it down the wall and across the floor to where the new sink will be. We are thinking to add a water filter under the sink so the feed to the bathroom and hot water heater does not connect directly to the cold feed.

Hot And Cold piping

Once all the piping was laid then had to insulate the hot water pipe . This is due to concrete sucking the heat out of the pipes. Well I have found this since we messed around with the hot feed to the current shower. I used squirty foam to insulate the pipes... as it is slightly simpler than the type that comes preformed.

Added insulation for the hot line - I love squirty foam.

And once the foam was set it was time to poor the final layer of concrete so that we have a new floor.... It does not need to be that great as it will be tiled in the end.

And now we have a floor again.....

The last bit of work is to connect the hot heater to the new cold feed. The pipes go up the wall, heading for the roof and the location of the future solar hot water heater, so it was just a mater of a longer connecting pipe and it was all done.

Hot water heater before new cold connection


And after