Before we could paint the office we needed to do a fair amount of patching, some of the walls and the ceiling were cracked, and had paint flaking off. One place in particular was a patch of the ceiling where in the past we have had some water come in.
The bad patch on the ceiling.
Looks better with a little plaster.
After the plaster had dried it was time , to put on some paint, unfortunately the paint was a little old and had gone a bit thick, even mixing in a little water didn’t help to much. So the paint didn’t go very far, I managed to put one coat on the ceiling and about half the walls, before I ran out of paint.
No comments:
Post a Comment