On the lower patio we have a number of pipes for the grey water irrigation that used to just sit on the surface, but with the changes to the lower patio these are now being placed in large red tubes that need to get buried under the earth as we put it in.
So having put the pipe in we needed to fill in some earth on top to make sure that the path was still useable.
OK looking from the other direction you have to go up over the pipe before you go down the ramp, but hopefully that will get in filled in the next couple of weeks.
The side wall of the ramp which is almost finished now, showing the irrigation pipe coming out through the wall instead of over the top as it used to.
A long time ago we built a small wall on top of the bathroom roof. One part never got finished this was a small curve to blend the top of the wall with the slope down to the existing wall. so with a board screwed to the side of the wall and a few pieces of bar inserted top stop the whole lot sliding down the slope this is already to be cemented next time we make some.
No comments:
Post a Comment