One of the little jobs that had to be completed before the painting of the walls could continue was what we call the “vent hut”. On the roof we have always had this little square block and underneath was a circular hole which we believed was for a heater before the hole was made in the wall to connect the kitchen and the rest of the house. Our intention is to use this to make a ventilation system to help keep the house cool in the summer.
Helen through the hole.
once the cover was removed from the top and with a board placed below it was time to insert the pipes that will handle the air extraction, the water feed up to the solar hot water heater that will be fitted one day, and control and power cables.
Then we built a wooden frame to make the base.
Fill with concrete and job is done for today. But there was time just to finish off a few little other jobs, like prepare the wall of the bathroom ready for the render. The blue is a mesh which is fixed on the wall to help the render stick and not crack.
No comments:
Post a Comment