Time to put the top on the vent hut. This entails first building a wooden frame round the out side and inside of the top of the vent hut, this is sloped of the inside to take the racilliones which will provide the base for the roof.
Embedded in the back of the wall will be two pipes which will provide an exhaust, and also an inlet for the air.
Once the frame work is complete it’s time to pour the concrete, once the concrete is up to a level the racilliones need to go on.
And that’s that, just time for a long shot to give some idea of how it would look.
No comments:
Post a Comment