Monday, October 31, 2011

Another stab at the slab

Having given the first section of the lower patio a few days to dry, it was time to move on to the  next section.

DSCF3971

Once the frame is all pegged out it’s time to run up and down the side of the house with the cement until it’s filled.

DSCF3974

So that's now 2 sections complete on 1 more to go then the cement mixer can be moved down then only the gravel needs shifting and that can be done in short periods over a few days.