Saturday, March 17, 2012

A slab on the wild side

Having got a complete slab of concrete on one side of the lower patio, it time to start on the other side. So we moved the frame into position and then shifted several barrow loads of gravel down from the top. After a rest for several hours and lunch it was time to star the concrete pour, the second in 24 hours! It took a while longer for this one as it is a large area and quite thick, and it slopes up to meet the ramp at the end. But once done gives a nice feeling.DSCF4028

DSCF4030

No comments: