Just a couple of bits to tidy off and the kitchen is rendered.
The window wall.. lower half wasn’t too bad and will be under the cabinets so we left it as is…
Join in our quest for a house of the stars. Through this web site we will keep you up to date with our search and eventual restoration of our dream property on the tranquil island of La Palma.
Just a couple of bits to tidy off and the kitchen is rendered.
The window wall.. lower half wasn’t too bad and will be under the cabinets so we left it as is…
With the shelves complete and drying, the side and the fronts of the unit need to be rendered.
First the side gets a bit of wood screwed to the edge to guide the depth of the render, which then is applied
With Yesterdays work on the wooden former, today's job is to fill it with concrete.
Fill the first section with concrete...Add the next bit of wood…
And Repeat the process……
Then find a half built garden wall to use up the rest of the cement that you have left….
The oven unit that we were working on before needs a small section of concrete putting in to fill the gap between the shelf and the top of the oven. We couldn’t do this before because until the shelf for the oven was constructed we couldn’t tell exactly where the oven would sit. It’s a little tricky as it’s only a small section, that sits at the front the unit.
First two supports are screwed to the side walls.
Then a board is slid in place.
A board is mounted to make the back of the concrete.
A couple of small bits are added to reinforce the whole lot and fix it to the rest of the unit.
Then the boards at the front are fitted more will be added as we pour in the concrete.
This year we decided to put a net over the pear tree to stop the insects and other things getting at them. Only we didn’t quite get to them in time and a lot had gone over ripe before we got to them, but we did have enough to bottle to provide puddings over the next year.
Slowly, bit by bit we are winning the battle, and the kitchen is starting to take shape.
Still a lot to do…
Time is moving on, work has been difficult over the last few weeks just due to the temperatures, being somewhere in the 30’s. But with a spell of cooler weather it’s time to get on.
We now have to tackle the job of getting a smooth flat surface on the kitchen walls ready to take tiles