Project planing is underway and so is the preparation for the planing permission for the new bathroom and the covered terrace / out side kitchen / barbecue area... I hope that we can get it all done for the end of the year.
Just realised why doing the windows has dragged, I may have only done two windows but that is 36 pains of glass that have been replaced and that sounds like a lot of glass, 36 pains of glass (around 12 new pains and 3.5Kg of putty)

One other accomplishment is that the test gray water recovery system is now operating - OK that is a few meters of plastic pipe, some guttering and a 500 liter tank. The plan is to use this to test out different filter materials. So far sand was a complete failure as it completely congealed and would not let the water through. Currently we are using 3 sizes of gravel - this seems to work OK But is starting to clog up as well.


We need to gray water system to be in before the bathroom is done so that it can be connected to it.