Here we are with another Helresa contraption to make things a little more easy for us.
The Problem:
We need to pour concrete for the foundation of the wall repair two terraces below the cement mixer. In the past we have just carried it down in a bucket. This time there is quite a bit to move (about 8 to ten mixes) at 4 bucket loads a mix that is around 40 trips.
The Solution:
A rope slide... We have ridged up a line from the poles that hold up the vines out side the back of the house, down to a power pole on the terrace. Then the bucket gets slid down ... the concrete poured in to a wheelbarrow and then poured in to the foundation.
In Practice:
Once it was set up we discovered one small problem, the rope streches a little under load so that the bucket hit the ground on the terrace above its destination. But this was simple to solve, a little less in the bucket and put the rope up a little higher on the pole. Once this was done it actually worked quite well, most of the time.
Friday, April 24, 2009